This technical note documents the validation of the Wellington Transport Strategy Model (WTSM) as part of the 2013 update of the model. The validation process ensures that the WTSM is…
This technical note documents the validation of the Wellington Public Transport Model (WPTM) as part of the 2013 update of the model. The validation process ensures that the WPTM is…
Link to report prepared in July 2015 for GWRC by LWP as part of the draft Natural Resources Plan process
WHEN: July 1 2015 4:00pm – 8:00pm
WHERE: Greytown Community Library