Opus International Consultants Limited (Opus) and Arup Australia (Arup) were commissioned by Greater Wellington Regional Council (GWRC) to rebase the existing 2006 Wellington Transport Strategy Model (WTSM) to a new…
“Consent orders version” of proposed Regional Policy Statement (2012)
This technical note describes the cleaning and analysis of the rail intercept surveys that were carried out by TDG and Research NZ as part of the Wellington Public Transport Model…
There is no digital version of this document available, but you can get in touch with publications@gw.govt.nz to get a copy of the document.
alarm Published 31 Dec 2013This technical note (TN) documents the calibration and validation of the Wellington Public Transport Model (WPTM). Whilst there are a lot of comparisons of modelled versus observed undertaken and reported on…
This technical note describes analysis of the bus intercept surveys. These intercept surveys were carried out to inform the development of the strategic Wellington Public Transport Model (WPTM) as part…
Opus International Consultants Limited (Opus) and Arup Australia (Arup) were commissioned by Greater Wellington Regional Council (GWRC) to rebase the existing 2006 Wellington Transport Strategy Model (WTSM) to a new…
Opus International Consultants Limited (Opus) and Arup Australia (Arup) were commissioned by Greater Wellington Regional Council (GWRC) to rebase the existing 2006 Wellington Transport Strategy Model (WTSM) to a new…
Opus International Consultants Limited (Opus) and Arup Australia (Arup) were commissioned by Greater Wellington Regional Council (GWRC) to rebase the existing 2006 Wellington Transport Strategy Model (WTSM) to a new…
The Wellington Transport Strategic Model (WTSM) and the Wellington Public Transport Model (WPTM) are the modelling tools that have been updated / developed for Greater Wellington Regional Council (GWRC). The…
The base year public transport (PT) demand matrix in WPTM was developed from observed data sources. As such, it is a highly reliable and accurate representation of current PT demand.…