This report reviews the sediment transport process down
the Hutt River. It calculates the amount of material
transported of bedload and suspended load, and bases
these estimates on the…
The development of a sediment budget for the Hutt River is
critical to making an assessment of the environmental
effects of sediment mining from the river mouth. This
report forms part…
This report discusses the physical environmental processes
operating in the Hutt River, and at the Petone Coast. It
provides the basis for all the Opus technical reports on this
series,…
The vision of the Wellington Regional Land Transport Strategy
(RLTS) 2010 - 2040 is to deliver an integrated land transport
network that supports the region's people and prosperity in a…
Greater Wellington (Flood Protection) currently holds
resource consent allowing river bed extraction for the
Hutt River downstream of the Estuary Bridge (Figure 1).
The consent is due to expire…
This publication reports on a range of measurements carried out
on the lower channel of the Hutt River, between Waione Bridge
and the Hutt River mouth, and along Petone Beach.…
This Wairarapa Landscape Character Description documents stage two of the three-part Wairarapa Landscape Study, a comprehensive landscape assessment of the Masterton, Carterton and South Wairarapa districts.
This report summarises the remediation work carried out on
the lower reaches of the Waiwhetu Stream, between Bell
Road and Port Road Bridge (the "U-channel"), including the
salt marsh located…
A project to remove contaminated sediments from and widen
and deepen the Waiwhetu Stream was carried out over the
period November 2009 through May 2010. This report
summarises the remediation…
This Wairarapa Landscape Character Description documents stage
two of the three part Wairarapa Landscape Study, a
comprehensive landscape assessment of the Masterton, Carterton
and South Wairarapa districts.
The flow chart inside…