This document contains the letter stating a clarification for several points raised at the seventh Hearing Panel Meeting.
This document contains the seventh minutes of the hearing procedures and the commissioners directions.
This document contains a letter regarding the construction methodology of issues raised in the Eastern Bays Shared Path project reviews from Megan Oliver and Shannon Watson (GWRC).
This document contains a review of the alternatives and design features relating to the Eastern Bays Shared Path project.
This document contains the peer review of the Assessment of Recreation Effects associated with the proposed Eastern Bays Shared Path.